The Science

Validated by design. Reviewed by experts.

Validated by design. Reviewed by experts.

Horne is a research-backed company advancing toward deployable fusion power. Learn what we have built, who has reviewed our work, and what comes next.

The hardware

Built in the workshop, not on a whiteboard.

Built in the workshop, not on a whiteboard.

Horne has built two generations of devices, including a test facility staffed for operation with multiple operational test beds.

5

5

Multi-tesla HTS magnets

~50 kV

~50 kV

Operational coil bias

22 K

22 K

HTS magnet temperature

10⁻⁸ Torr

10⁻⁸ Torr

Vacuum capable

2

2

Generations of devices

IP

IP

Patents issued

Superconducting hybrid confinement

A plasma device that combines electrostatic heating with magnetic cusp confinement, with demonstrated magnetic shielding of electrostatically charged coils.

Magnets made in-house

Multi-tesla high-temperature superconducting (HTS) magnets designed, manufactured and validated in Colorado.

Outside review

Advised by industry-leading experts.

Advised by industry-leading experts.

Horne’s simulation engine runs on WarpX, the plasma code that won the Gordon Bell Prize. Outside experts have reviewed how we use it.

Princeton Plasma Physics Laboratory

Reviewed and confirmed Horne's benchmark against the University of Sydney Hedditch reference case.

Lawrence Berkeley National Laboratory

Advised on Horne’s WarpX implementation and modified WarpX for diamagnetic plasma modeling.

RadiaSoft

Found the model physically consistent and robust across order-of-magnitude changes in scale.

Simulation

Software simulations that model real results.

Software simulations that model real results.

5,000+

5,000+

Simulation runs

800+

800+

Production cases evaluated

30

30

GPU cluster (PERI), running 24/7

Our software layer, Asterion, sits on WarpX. PERI is Horne's in-house GPU cluster, with 10 nodes and 30 GPUs. The models guide the design of our next fusion core and the high-flux prototype that follows.

Milestones

From first patent to first high-power plasma.

From first patent to first high-power plasma.

2021

Spindle cusp validation. Confinement validated using superconducting magnets.

2022

First patent issued. C-Corp formed, facility and team stood up and high-power device fabrication began. (US 11,482,342).

2023

Magnet manufacturing, subsystem validation and grid shielding demonstration. In-house design and manufacture of multi-tesla HTS magnets. Magnetics, cooling, ion injection, vacuum, control and metrology validated. Magnet shielding validated.

2024

Dual magnet integration, with upgraded cryogenic, magnetic and electrical systems. First high-power plasma on Dec 16, 2024. Second patent issued for a fusion device with toroidal superconducting coils and inertial electrostatic heating (US 11,948,696 B2).

2025

Models and diagnostics. Magnetic parameter testing explores the operating space. Field and plasma models begin, and diagnostics are added to validate and iterate the simulations.

2026

Simulation engine in production. Asterion and PERI running; first design study complete; 4-ring toroidal configuration under optimization. Plasma modeling with a national lab partner and high-power ion source development under way.

Dec 2026 to 2027

Conceptual design reviewed by national lab, build high-flux prototype. High-flux neutron source facility build-out.

Backers

Backed by people who share our vision for fusion.

Backed by people who share our vision for fusion.

All prior investors continue to support Horne Technologies. Cottonwood Technology Fund and Aspect Holdings lead Horne’s Seed and Seed Extension rounds. Free Radical Ventures invested pre-seed and continues to play an integral role.

Ask for the data behind the build.

Ask for the data behind the build.

Ask for the data behind the build.